Truckport
Object
Covered parking space with integrated photovoltaic system
Dimensions
for example 10m x 8m x 3m (L x B x H) for up to 6 cars or 3 trucks
Construction time
Total construction time 60 days (45 days production, 15 days installation)
While the customizable construction of the Truckport® provides optimal protection for vehicles, the PV system integrated on the roof reliably supplies ecological electricity, which can be used, for example, to charge e-vehicles or to optimize electricity consumption. The high promondis competence in project planning results in a highly attractive price.
Planning
When planning the Truckport®, the local conditions such as B. the wind load zone or snow load taken into account
Engineering
The engineering of the truck port is specially adapted to customer-specific requirements
Construction
In addition to the construction and assembly of the Truckport®, promondis can also organize the associated civil engineering work on request
Additional benefit
The Truckport® also offers additional functions such as B. as a covered storage area or as a charging point for e-vehicles
Promondis Truckport®